| 1. Before power shaft installation check up a condition of a sealing ring of a power shaft in a transmission. |
| 2. Clear шлицы for a power shaft in a nave and a transmission. Grease with a thin layer of greasing working edges of a sealing ring, шлицы a power shaft and flanges. |
| The left power shaft |
| 3. Establish a power shaft in differential, having combined шлицы a power shaft with flutes of semiaxial gear wheels of differential. Insert a power shaft into a transmission against the stop. |
| 4. Establish the external end of a power shaft in a nave. |
| 5. Establish a protective plate to bottom spherical шарнирному to connection, then connect bottom шарнирное connection with the lever. |
|
6. Establish a new nut of fastening шарнирного connections and tighten its demanded moment. Grease an inside and a carving of a nut of fastening of a power shaft with pure engine oil, screw it on a power shaft and tighten the demanded moment. Check up that the nave rotates freely then establish a blocking washer. |
|
7. Fix a blocking washer spring шплинтом. |
| 8. Establish gauge ABS. |
| 9. Establish a wheel, then lower the car on the earth and definitively tighten bolts the demanded moment. |
| 10. Check up oil level in a transmission and if necessary add. |
| The right power shaft |
| 11. Check up that the intermediate bearing rotates easily and in regular intervals. Be convinced that is absent люфт an external ring in relation to the internal. |
| 12. Grease with a thin layer of greasing an external ring of the intermediate bearing and an internal ledge for a dustproof cover. |
|
13. Insert the internal end of a shaft through a suspension bracket of installation of the intermediate bearing and establish a dustproof cover on a power shaft. |
| 14. Combine internal шлицы a power shaft with grooves of a semiaxial gear wheel of differential, and the intermediate bearing with an installation suspension bracket. Insert a power shaft against the stop into a transmission. |
|
15. Establish the external hinge of equal angular speeds in a nave. |
|
16. Check up correctness of installation of the intermediate bearing, then turn bolts on 90 ° and fix them in this position by nuts. Close the intermediate bearing a dustproof cover. |
| 17. Establish a protective plate to bottom spherical шарнирному to connection, then connect bottom шарнирное connection with the lever. |
| 18. Establish a new nut of fastening шарнирного connections and tighten its demanded moment. Grease an inside and a carving of a nut of fastening of a power shaft with pure engine oil, screw it on a power shaft and tighten the demanded moment. Check up that the nave rotates freely then establish a blocking washer and fix its spring шплинтом. |
| 19. Establish gauge ABS. |
| 20. Establish a wheel, then lower the car on the earth and definitively tighten bolts the demanded moment. |
| 21. Check up oil level in a transmission and if necessary add. |